Residential Project- State Lodge Lusaka

This project involved the installation of reinforced concrete culverts and headwalls at the National Milling site, aimed at improving stormwater drainage and protecting surrounding infrastructure.

The scope of works included excavation, formwork, steel reinforcement fixing, concrete casting, and proper alignment of culverts, followed by the construction of durable headwalls to control water flow and prevent erosion. All activities were carried out in compliance with engineering specifications, safety standards, and site regulations.

The project was successfully completed with a strong focus on structural integrity, safety, and long-term performance, ensuring efficient drainage and enhanced site functionality.